Duty Shift Technician SOW (after 8.00pm)
Observe the temperature and RH Warehouse area.
Turn OFF 1-unit chiller, 1-unit CHWP, 3-unit AHU (AHU is different location) & 1-unit ADU.
Re-observe the temperature and RH Warehouse area.
Round check for any abnormality of system, equipment & building:
Incoming water pressure reading & water tank level.
Domestic water pump condition.
Main fire alarm panel.
Transformer & LV Room.
Perimeter surrounding check.
Ad-hoc SOW (if necessary)
Shut OFF few waters incoming valve to investigate leakages due to high water usage.
Any other special job that only can perform after operation end.